70MW Solar Plant Up and Operating in Less Than a Year – After Gutenberg
歐洲最大太陽光電廠在一年內由SunEdison(Spanish) 2010/Nov. 興建完畢並且營運, 這座義大利的PV Power Plant總發電量達70MW (DC 約82MW).
最大不稀奇, 這麼大的工程竟然可以在一年內完工上線必有其強處.... 但是CNET的評論卻覺得除了取得融資的支持外, 主要是因為ITALY政府從中央到地方全力支援才能這麼快達成 並無什麼值得說嘴的...
SunEdison目前在官網上只有數篇新聞稿報導 但沒有列出該公司對這個計畫的獨到之處...
底下是其宣傳要點 commercial solar energy system while enjoying:
-No upfront costs
-Increased freedom from volatile fuel rates
-Long-term predictably priced rates, equal to or lower than retail energy rates
-Immediate energy savings
-Fully managed services
-Maximized use of solar investment credits and other solar incentives
-Support for corporate messaging and sustainability initiatives
government customers:
-Quickly deployed photovoltaic solar energy
-No upfront capital costs
-Transparency in energy delivered and financial savings
-Immediate energy savings
-Predictable long-term energy costs
-More energy and more savings (our fleet has always performed at more than 100% of expected generation)
-Maximized use of solar investment credits and other solar incentives
-Assistance with public outreach and communications on environmental leadership
A SIG blog to track Motech and Solar industry information. 太陽能產業及茂迪股份公司資訊追蹤. 任何註冊字眼歸原公司所有, 任何論述亦不代表各公司立場 僅為網友評論.
DISCLAIMER / 免責聲明
This blog and any of its contents or posts ("DOCUMENT") is provided "as is", without warranty of any kind or fitness for a particular purpose, either expressed or implied, all of are hereby explicitly disclaimed. In no way can any author of this blog, jwhwang, MotechSIG itself, or the Solar-Motech blog ("AUTHOR") be made liable for any damages that are caused by this "DOCUMENT". You are using this "DOCUMENT" at your own risk!
本網誌所有言論與其他連結網頁僅供參考, 任何運用本網誌資訊者須自負風險. 若因參考本網誌資訊而造成任何損失, 本網誌皆不負責!
沒有留言:
張貼留言